Installation of Jacket (FYB), Bridge & Topside in Foroozan Field

Year: Ongoing Project

Installation of Jacket (FY), Bridge & Topside in Foroozan Field

Client: I.O.O.C.

Water depth: 48.3

Weight: 1012 Ton

Forouzan oil field is joint between Iran and Saudi Arabia where the development project has been contracted by Iran Offshore Oil Company (IOOC). This project includes load-out, transport and installation of Jacket FY, topside, living quarter and platform. The jacket and accessories have been constructed in Qeshm Island.

Weights:

Jacket 1012 tons

Topside 870 tons

Link structure 475 tons

Access bridge 49 tons