Year: Ongoing Project
Installation of Jacket (FY), Bridge & Topside in Foroozan Field
Client: I.O.O.C.
Water depth: 48.3
Weight: 1012 Ton
Forouzan oil field is joint between Iran and Saudi Arabia where the development project has been contracted by Iran Offshore Oil Company (IOOC). This project includes load-out, transport and installation of Jacket FY, topside, living quarter and platform. The jacket and accessories have been constructed in Qeshm Island.
Weights:
Jacket 1012 tons
Topside 870 tons
Link structure 475 tons
Access bridge 49 tons