Year: Ongoing Project
Installation of Jacket (F18) & Topside in Foroozan Field
Main Client: I.O.O.C.
Water depth: 48.7
Weight: 827 Ton
Engineering, procurement, the sub-contract for works consist of management, coordination, engineering, weighing, load out, transportation and installation of jacket and related appurtenance (Pile, conductor fitter, boat landing, barge bumpers, navigation, Stairs, handrails) as well as topside.
The F18 platform will be installed in a location about 2100 m from existing FX platform in the FOROOZAN complex.