11

Year: 2004

Salman Oil Field EPC-2 Platform Installation

Client: PEDCO

Weight: 450 Ton

Length: 32 m

This project included transportation and installation jacket in Salman oil field, Sadaf after the engineering decided to use Vertical lift vertical lift method for installation water depth was 54 meter approximately.

 

Year: 2006

Salman Oil Field EPC-2 Platform Installation

This project included load out, transportation and installation Topside in Salman oil field. Water depth in this project was 35 m and SADAF 3000 could performed this project.