Year: 2003
Salman Oil Field EPC-1 Platform Installation (Jacket)
Client: PEDCO
Length: 54 m
Weight: 650 Ton
This project included transportation and installation jacket in Salman oil field, Sadaf after the engineering decided that use horizontal method for installation water depth was 54 meter approximately.
Year: 2005
Salman Oil Field EPC-1 Platform Installation (Topside)
Client: SADRA
Weight: 820 Ton
Water Depth: 48 m
transportation and installation topsides including link bridge, topside using SADAF 3000 and OFOGH 1 for lifting and positioning as well as.