Salman oil field EPC-1 platform installation

Year: 2003

Salman Oil Field EPC-1 Platform Installation (Jacket)

Client: PEDCO

Length: 54 m

Weight: 650 Ton

This project included transportation and installation jacket in Salman oil field, Sadaf after the engineering decided that use horizontal method for installation water depth was 54 meter approximately.

 

Year: 2005

Salman Oil Field EPC-1 Platform Installation (Topside)

Client: SADRA

Weight: 820 Ton

Water Depth: 48 m

transportation and installation topsides including link bridge, topside using SADAF 3000 and OFOGH 1 for lifting and positioning as well as.