Year: 2008
Loud-out & Installation of SPOL Jacket
Client: SAFF Co.
Weight: 1250 Ton
Water Depth: 68/8 m
This project included load out, launch, upending & pile driving of a 1250 tone jacket in the South Pars field in the Persian Gulf.
Positioning of the jacket was critical to align the conductor guide over pre-drilled wells.
In addition to jacket installation, lifting and placing of appurtenances such as boat landing, barge bumpers and a wellhead module were accomplished.