Loud-out & Installation of SPOL Jacket

Year: 2008

Loud-out & Installation of SPOL Jacket

Client: SAFF Co.

Weight: 1250 Ton

Water Depth: 68/8 m

This project included load out, launch, upending & pile driving of a 1250 tone jacket in the South Pars field in the Persian Gulf.

Positioning of the jacket was critical to align the conductor guide over pre-drilled wells.

In addition to jacket installation, lifting and placing of appurtenances such as boat landing, barge bumpers and a wellhead module were accomplished.