Year: 2007
Engineering, Purchasing & Installation of Subsea Cable between Sirri Island & Nasr Platform
Client: I.O.O.C.
Length: 74 Km Single Length Composite Cable (Power & Fiber Optic)
The SADAF responsibility covered engineering, procurement, installation, commissioning and handing over two high voltage 33 Kv composite power and control cable between the Nasr offshore production platform & the Siri Island field terminal with a total length of 74 Km. The scope of work included geophysical & geotechnical surveys of the chosen route together with function testing of the cable after installation.