"> Construction of Pipe & Cable Laying Barge (PCLV 75) – DARYA FAN QESHM INDUSTRIES COMPANY (SADAF) Co.
Skip to content
logo

DARYA FAN QESHM INDUSTRIES COMPANY (SADAF) Co.

FA EN
  • Home
  • Managing Director View
  • Projects
    • Implemented Projects 1
      • Implemented Projects 2
        • Offshore Pipe Rack-OPR(Hara-gheshm)
  • QHSE
  • Core Activity
  • Marine Fleet
    • SADAF 3000
    • OFOGH 1
    • LB 90
    • OFOGH 2
    • PCLV 75
    • SADAF POSHTIBAN
    • PIONEER 209
    • SAFF 3
    • SADAF DREDGER
  • Factories
    • SADAF Factory 1
    • SADAF Factory 2
  • Satisfaction Letters
  • Job Openings
  • Contact

Recent News

  • Successful Installation of Jacket SPD12E (11B)

    Client: PETROPARS & POGC Water depth:70.7 m Weight: 2200 Ton Installation of jacket SPD12E(11B)In Phase 11 PARS JONOBI

    Added August 19, 2020
  • Successful Launching Operation of Jacket SPD12E (11B)

    Client: PETROPARS & POGC Water depth:70.7 m Weight: 2200 Ton Load out and launching jacket SPD12E(11B)In Phase 11 PARS JONOBI

    Added June 7, 2020
  • Successful Installation of Topside (S1) In SALMAN Field

    Client: I.O.O.C Water depth:23 m Weight: 1200 Ton Management, Coordination, Engineering, Weighing, Load Out, Transportation and Installation of S1 Topside

    Read more »

    Added June 7, 2020
  • Successful Installation of JACKET (F18) & Topside in FOROUZAN Field

    Client: I.O.O.C Water depth:48.7 Weight:827 Ton Engineering, Procurement, the sub-contract for works consist of management. Coordination, engineering, weighing, load out,

    Read more »

    Added August 26, 2019
  • Successful Installation of JACKET (FY), Bridge & Topside in FOROUZAN Field

    Client: I.O.O.C Water depth:48.3 Weight:1012 Ton FOROUZAN Oil Field is joint between Iran and Saudi Arabic where the development project

    Read more »

    Added August 26, 2019
  • Salvage operation of Shipwreck W21 in Arvand River

    SADAF Co. successfully performed the salvage operation of a 26 meter length vessel identified

    Added November 22, 2017
  • Loadout of F18 Jacket , Forouzan Oil Field

    Once again, diligent engineers in SADAF Co. successfully performed the loadout of F18

    Added September 29, 2017
November 21, 2017November 21, 2017

Construction of Pipe & Cable Laying Barge (PCLV 75)

Post navigation

← Installation of Hengam Field Jacket E4 & E2
Engineering, Supply and Installation of Submarine Pipeline, Riser Plem, Mooring Chain, Flexible Risers for Installation of New FSU in Soroush field In the Persian Gulf (EPCI) →

We are one of the pioneers in Oil and Gas industry, benefiting from the modern technical knowledge and high quality in providing Engineering, Procurement & construction services for performing its projects, considers all of international standards obligations (ISO 9001,ISO 14001 & OHSAS 18001) to reach its goals

Head Office:
Ario Building, Derakhshan St. Corner,
North Falamak Ave., Phase 4, Shahrak-e-Gharb,
Tehran, IRAN
Telephone: (+9821) 88375489
Fax: (+9821) 88375034
SADAF Co. Email Contact: info@sadaf-mit.com

PROJECTS

  • Implemented Projects 2
  • Implemented Projects 1

LINKS

  • Saba Company
  • Shell

POLICIES

  • Sitemap
  • Privacy Policy

MAIN SECTION

  • Managing Director View
  • Core Activity
  • News
  • Factories
  • Marine Fleet
Copyright © SADAF Co. 2017. All Rights Reserved. Powered by Shokoufeh Safa