Year: 2015
Bahregansar Subsea Pipeline Project in Bahregansar Field
Two Pipeline Spool (42 and 55 m) and two associated riser (40 m)
Client: I.O.O.C.
The SADAF scope of work for the Bahregansar Subsea Pipeline Project comprised the detailed design, surveying, material specification and procurement, fabrication, installation/tie-in, pressure testing of all pipeline sand J-tubes & all accessories.
Details of the new pipelines, all connecting to the MP platform, were as follows:
- Two 1.02 Km 6ins pipelines from platform WHP4
- One 2.26 Km 6ins pipeline from Platform WFIP5
- One 1.16 Km 6ins pipeline from Platform WFIP6
- One 0.55 Km 6ins pipeline from Platform WHP7
- One 1.62 Km 6ins pipeline from MWP7