Installation of New SWIP (Sea Water Intake Platform) Platform in Sirri Island

Year: 2009

Installation of New SWIP (Sea Water Intake Platform) Platform in Sirri Island

Water depth: 38 m

Weight: 220 Ton

Transportation, installation and pile driving of a new 220 Tone steel topside module to serve as the principal raw water supply for the Siri oil field development.

Sadaf for performed similar project shall provide specific plan for operation as follow:

  • Load out
  • Sea fastening
  • Transportation
  • Positioning and anchoring SADAF 3000
  • Lifting
  • Installation