Year: 2005
Installation of Water Intake Culvert for Mobin Petrochemical Refinery in South Pars Field
Client: SADRA
The project included preparation of all engineering documents for the design of culverts, and installation aids, with full specifications, calculations, drawings, specifications, calculations, drawings, specifications, etc. including pipeline alignment sheets, surveying, and dredging procedures.
Installation of the 610 tone reinforced concrete culvert sections was performed by the sheerleg SADAF 3000 crane barge by placing the culvert sections in pre-dredged cuts in the sea bed. The intake culvert had a length of 1000 meters and the outfall culvert had a length 120 meters.