Successful Installation of JACKET (FY), Bridge & Topside in FOROUZAN Field

Client: I.O.O.C

Water depth:48.3

Weight:1012 Ton

FOROUZAN Oil Field is joint between Iran and Saudi Arabic where the development project has been contracted by Iran Offshore Oil Company (IOOC). This project includes load-out, transport and installation of jacket FY, topside, living quarter and platform. The jacket and accessories have been constructed in QESHM Island.

Weights:

Jacket 1012 tons

Topside 870 tons

Link Structure 475 tons

Access bridge 49 tons